Kitchen was completely finished in June; appliances installed July 3rd. Took me about 1 week to put the kitchen back together and by then.....I.was.done. Taking pictures was the last thing on my mind. So, here it is......
KitchN'Sync...
living through a kitchen remodel
Wednesday, May 15, 2013
Friday, June 22, 2012
Almost There
Back splash installation is scheduled for Monday. It's been dragging on way too long with them. I told them they need to be in and out by Wednesday and if need be, could start today and work on the weekend. Appliances will be installed Thursday.
Thursday, May 31, 2012
Missing In Action
FLOOR
I know I have not been updating with photos. Honestly, I've checked out of this process. Tired of it. Second-guessing every decision. Sick of pizza. Dust everywhere. I love painter's tape, almost as I love sharpies, and even that is getting old. I've been taking pictures throughout and telling myself I'll post them later. Later has turned into 20 days. So, thanks, Marlena, for pushing me!
The floor went in 2 weeks ago. I'm getting used to it. It's a big change from having honed and filled travertine and very tight grout lines, to grout everywhere and tripping over my feet with the new stone.
LET THERE BE WATER
Last Monday (5/21), the faucets went in. No more walking down
REFRIGERATOR
"Mom, that is really ugly. Why didn't you get something that was really nice"?
All other appliances are in the garage, still in boxes.
Glass was installed in cabinets today
Working on back splash now.
Friday, May 11, 2012
Wednesday, May 2, 2012
Granite
Templates/measurements are done for granite. Will be installed May 10th. Should have brought the camera instead of taking pics with phone. Hopefully, there is enough stone. The templator said we are short for the split linen counter. Talked to the fabricator and I think I offended him because he said, "he's been doing this for 20 years". Everyone knew the sq ft needed and said two slabs would be enough. The templator was really nice and I said, "come on, let's go back outside and make this work". He did! Now, every time the phone rings, I think it's Yoni calling, "we cracked your stone and we don't have enough"!
M A S C A R E L L O
Before we made it all fit |
Island |
Monday, April 30, 2012
Kitchen Pictures Up!
I forgot to take photos this weekend! I don't know how to use the camera and adjust lighting; photos are not that good.
Finishing touches are being made this week on kitchen and entertainment center. I am going to North Hollywood Tuesday morning to meet the fabricator and go over template. Granite should be installed next week.
Finishing touches are being made this week on kitchen and entertainment center. I am going to North Hollywood Tuesday morning to meet the fabricator and go over template. Granite should be installed next week.
Friday - April 27th |
Friday - Apriil 27th beading was being held in place on arch below upper cabinet |
Monday - April 30th Appliances back on kitchen table - all are tired of banging our knees on outdoor table we had set up in hall way now that island is in place |
MW and warming openings |
The elephant in the room - this island grows every.single.day. Back side of island not cut out yet for granite |
Backside of island |
Dishwasher opening |
I see a lot of pockets being ripped off shortly |
Family room - waiting for frame for tv |
Bedroom - door to boxes being adjusted |
![]() |
Sean's desk - painter not done below! |
![]() |
Split linen - tv equipment housed behind meshed doors for tv in gameroom |
Thursday, April 26, 2012
Update
I hope to post pictures by tomorrow. Crown is going up and doors.
Granite guy is here to make template....gotta run. Check back Friday!
Granite guy is here to make template....gotta run. Check back Friday!
Wednesday, April 18, 2012
Tuesday, April 17, 2012
KiTcHeN
Friday, April 13, 2012
Seems it Never Rains in Southern California...
except when the kitchen is to be delivered! Waiting to see if they will be deliver; here's a peak at the built-ins in progress....
Kitchen delivered in between downpours!
Kitchen delivered in between downpours!
family room |
bedroom |
pantry in back corner, turned sideways. tall cabinet in front is upside; will case the referigerator |
split linen |
cabinets are set in approx position; the back side of island is facing the wall & will be turned counter clockwise |