Monday, April 30, 2012

Kitchen Pictures Up!

I forgot to take photos this weekend!  I don't know how to use the camera and adjust lighting; photos are not that good. 

Finishing touches are being made this week on kitchen and entertainment center.  I am going to North Hollywood Tuesday morning to meet the fabricator and go over template.  Granite should be installed next week.


Friday - April 27th

Friday - Apriil 27th
beading was being held in place on arch below upper cabinet

Monday - April 30th
Appliances back on kitchen table - all are tired of banging our knees
on outdoor table we had set up in hall way now that island is
in place






MW and warming openings

The elephant in the room - this island grows every.single.day.
Back side of island not cut out yet for granite

Backside of island

Dishwasher opening


I see a lot of pockets being ripped off shortly

Family room - waiting for frame for tv

Bedroom - door to boxes being adjusted

Sean's desk - painter not done below!

Split linen - tv equipment housed behind meshed doors
for tv in gameroom


Thursday, April 26, 2012

Update

I hope to post pictures by tomorrow.  Crown is going up and doors.

Granite guy is here to make template....gotta run.  Check back Friday!

Tuesday, April 17, 2012

KiTcHeN

Kitchen cabinets installed Monday & Tuesday.  Said they would be done by Thursday.  Just not sure which Thursday of which week, or month, they are talking about...

Monday 4/16/12     


Tuesday 4/17/12


Tuesday 4/17/12
Space on wall is hood cabinet - was supposed to be delivered today.



Friday, April 13, 2012

Seems it Never Rains in Southern California...

except when the kitchen is to be delivered!  Waiting to see if they will be deliver; here's a peak at the built-ins in progress....


Kitchen delivered in between downpours!


family room


bedroom
pantry in back corner, turned sideways.  tall cabinet in front is upside; will case the referigerator
split linen


cabinets are set in approx position; the back side of island is facing the wall & will be turned counter clockwise

Sunday, April 8, 2012

Rome Wasn't Built in a Day; Nor Are Built-Ins

Split linen - as soon as I saw the white outlet, I said, "you can unscrew that".  He said to buy wood plates, they'll stain them.

Master Bedroom

Thursday, April 5, 2012

Phase I Delivered

Delivery of built-ins was Wednesday; the "holes" in these rooms will finally be filled after 11 3/4 years!
Truck was filled


Moldings

3rd garage filled



I am hoping the office plant can disappear


...and this Walmart-special tv stand. I think this is the last piece of furniture we bought when we first got married. I lost count of the tv's it's been home to over the years. It hasn't been out in public view except for the last 2 months.  Had to do some switching around when this tv came into play. 
Wait - our bedroom set is actually just as old.  That needs to go to.  In the next 5 years.

Tuesday, April 3, 2012

Solid Walls Again!

Dry waller was here today patching holes from the electrician and he added drywall to areas the plumber removed when he moved the gas line.  The heater vent on ceiling was moved about 6" away from wall yesterday.  The new range hood needs room up there.  Ceiling was textured in that spot.  Can't wait to see what it looks like when it's dry.  We just had the ceiling painted in August; said he can blend the paint without having to repaint entire ceiling.  Sure.

Heater vent moved further from wall